Dallas's route approval form distinguishes one portion, several portions in one move and portions carried in separate moves. It identifies separate permits for portions moved in more than one move. Ask the city how that distinction applies to the proposed manufactured-home haul before the transporter commits to a sequence of trips.
Describe the trips as well as the home
The Dallas route approval form records the proposed move dates and times alongside the portion arrangement. Have the transporter describe how it intends to carry the sections. If it proposes separate moves, resolve the city's permit treatment before assuming one application covers the entire job.

The same form asks for every street within Dallas used by the move, the origin and destination, and the structure's dimensions and use. Ask staff to identify the applicable city review for the actual route.
Request pricing for the actual sequence of section moves
Give the hauler the home's section count and both addresses. Ask how the proposed trips, dates and city permit responsibilities are reflected in the estimate.
Use the Dallas planning and development forms page for current submission instructions. Dallas now directs applicants to DallasNow and says most listed forms are references rather than documents that need printing.
Before dispatching a later section, check that its planned date and streets still match the applicable approval. Agree on the receiving sequence with the owner and installer, and have the quote state where each transport handoff ends. Installation and utility connections need separate arrangements.