The city checklist separates moves into, within and out of Waco. Incoming and local moves have destination-site requirements; local and outbound moves include a source-property tax certificate. Route and traffic information is a separate part of the submission.
Route details form a separate input
The checklist lists route, timing, affected lanes and required security documentation.
Confirm the HUD-code application
The checklist uses general structure language; ask which parts apply to the actual manufactured home.
Prepare the branch that matches the journey
The Waco structure-relocation checklist contains these Structure Relocation branches:
| Movement | Distinct preparation |
|---|---|
| Into Waco | Receiving site plan with placement, parking, utilities and foundation information. |
| Within Waco | Destination information plus a tax certificate for the source property. |
| Out of Waco | Source-property tax certificate and the outbound movement package. |
The checklist uses general structure language. Ask the city to classify the actual HUD-code unit; this page does not assert that every manufactured-home movement requires every item in a site-built-house relocation package.
Describe the Waco movement
Say whether the home enters, stays within or leaves Waco, and provide both addresses.
The route needs its own description
The listed movement information includes route, timing and lanes affected, along with required security documentation. Coordinate those details with the transporter rather than treating the shortest map route as approved.
Assign source records to the owner and receiving plans to the appropriate applicant. Installation, foundations, site preparation and utility work are separate from hauling. A transport quote does not issue a local permit or establish permission for the full highway journey.

