The city zoning ordinance provides a manufactured-housing special-exception path in specified residential districts. Establish the parcel, proposed home and required local decision before committing to delivery.
Special-exception path
The city ordinance addresses manufactured housing in the specified D-1 through D-5 and PRD districts through special-exception review.
Lot and layout
The conditions address a legal lot and site-plan details including setbacks, driveway and accessory components.
Home labels
HUD and Alabama labeling belong with the actual home records; a substitute unit needs its own matching review.
Build the receiving file around the actual lot
Chapter 4, Section 3C of the Birmingham zoning ordinance addresses manufactured housing in the D-1 through D-5 and PRD districts through special-exception review. Its conditions include a legal lot of record and a site plan showing setbacks, driveway and accessory components.

Give the city the parcel record and the intended home layout together. A street address, a vacant area or a seller’s assurance that a home will fit is not a substitute for the relevant zoning decision.
Plan a Birmingham delivery
Provide the parcel, unit dimensions and special-exception review status.
Prepare a consistent receiving file
- Identify the legal lot and proposed home together in the city inquiry.
- Show the home position, driveway and accessory components on the receiving plan.
- Provide the available identification and labeling for the home being purchased.
- Record the special-exception decision status and the party handling installation/foundation requirements.
- Share the resulting endpoint and any unresolved conditions with the hauler before relying on a delivery date.
Match the home documents to the plan
The ordinance also identifies HUD and Alabama labeling and an installation/foundation approval process. Confirm that the home being purchased is the same unit described in the receiving submission, and identify the installer responsible for the setup requirements.
For transport planning, the useful result is a destination decision and a receiving contact, not a promise that the transporter will secure an exception. Send the carrier section sizes, access information and the status of that decision. Foundation work, installation, utility connections and inspections belong to separately arranged receiving work; road permission remains a different question from permission to use the lot.
