Rochester zoning applies to relocated structures and uses within the city. Separate that destination review from any right-of-way permit needed for an obstruction, curb change or other access work associated with delivery.
Relocation is within zoning scope
Section 120-3 applies district rules to relocated structures; a reachable lot is not automatically an eligible site.
Do not generalize longer-project review
The Traffic Control Board rule for longer construction projects is not a blanket requirement for every brief haul.
Review the destination as a relocated structure
Section 120-3 of the Rochester Zoning Code places relocations under the applicable district rules. That is not a finding that every residential lot permits a particular manufactured home. Give Zoning the unit classification and parcel details and obtain the receiving determination for the actual proposal.
Keep any prior approval or existing-use record available, but do not assume it authorizes a new home or changed placement. A road route that reaches the address does not answer the land-use question.
Discuss the Rochester access plan
Share the home dimensions, receiving parcel and any anticipated street or curb work.
Describe the access work precisely
The city’s right-of-way permit guidance covers work and activities in the public right-of-way, including driveway or curb modifications and obstructions. If delivery needs such work, identify its location and duration for the Permit Office.

The page’s Traffic Control Board rule for longer construction projects is not a general rule that every brief manufactured-home haul needs that review. Ask the city to classify the actual access operation. The transporter evaluates the loaded move; separately arranged providers handle installation, utilities and site or curb work. Neither this quote nor a right-of-way application establishes destination approval.