For an Ogden move that requires driveway-approach expansion in the public right-of-way, have the responsible contractor show the proposed edge on the site plan. After the engineering permit is issued, the contractor must activate it and arrange the required inspection with the assigned inspector. Treat that work as a separate dependency in the home’s transport schedule.
Issuance is not activation
The contractor must activate the engineering permit to enter the inspection system.
Arrange the inspection
After activation, contact the assigned Engineering Inspector; the issued document does not complete this step.
The Ogden engineering permit guide includes a driveway-approach expansion example and explains permit activation. Activation puts the job into the inspection system; the guide then directs the contractor to contact the assigned Engineering Inspector. An issued document alone does not complete those steps.
Describe the entrance the home will actually use
Share the destination, home dimensions and any planned approach widening. Identify the separate access-work contractor so a transport inquiry reflects whether the entrance is ready or still under review.
Show the street-side effects of widening
Ogden asks for the work location, notes and existing sidewalk, curb and gutter on the site plan. Its traffic-control instructions call for a site-specific layout, with pedestrian traffic control where a sidewalk closes. Give the access contractor the carrier’s entrance needs so the proposed work and the eventual hauling arrangement do not rely on different assumptions.

These instructions concern physical work in the right-of-way. Ask the carrier separately about the home’s route and hauling permits; the driveway contractor’s engineering permit does not establish that the loaded home can travel to the site.
