Tell Marianna’s building reviewer if the original manufacturer’s installation instructions are missing or the receiving site is in a flood-hazard area. The city packet identifies design documentation for those circumstances. Have the reviewer and installer resolve what is required before treating the site as ready for delivery.
City review entry point
Marianna identifies EPCI as its contracted building plans, permitting and inspection provider.
Planning may precede construction review
City Planning determines whether a development order is required before the construction permit.
The Marianna building review and permitting page identifies EPCI as the city’s contracted provider for building plans review, permitting and inspections. Use that current city entry point to reach the reviewer for the receiving address.

Bring the manual and site questions together
The manufactured-home section of the Marianna construction permit information packet addresses anchoring design when original instructions are unavailable or a flood-hazard condition applies. Ask the reviewer which current documents are needed for your home and parcel. The linked packet includes older technical references, so it should not be used as a standalone installation design.
Disclose document gaps when planning transport
Provide the Marianna destination, pickup and home sections, and identify any unresolved receiving review. Request hauling with engineering, installation and utility work assigned separately.
Confirm the application and any earlier planning decision
The Marianna building permit application includes a mobile-home setup category. The information packet also says city Planning determines whether a development order is required before the construction permit. Let the responsible applicant settle that question and tell the carrier which receiving steps remain open.
