Use the mobile/manufactured-home placement provision for the applicable HUD unit and verify the destination zoning. Have the city confirm the classification before preparing a different industrialized-building submission.
Match the permit to the unit’s identity
The El Paso manufactured-home placement code, Section 18.02.105.29.3, addresses mobile and HUD-code manufactured-home placement. Its criteria concern the permanent chassis, dwelling use, applicable manufactured-housing standards and a location where zoning permits the home.

The adjacent industrialized-building provision follows a different review path. Give Planning and Inspections the actual home identification and supporting documents. A generic “factory-built” description leaves the important distinction unresolved.
Request an El Paso hauling quote
Include the home’s HUD or industrialized classification, dimensions and destination.
Coordinate installation without adding it to the haul
The placement provision also refers to manufacturer installation requirements and applicable city technical codes. Identify the installer who will address those items and ask what receiving approvals must be complete before the transport date is confirmed.
For a quote, provide the size of each transported section, departure address and precise delivery point. The transporter’s route assessment does not establish that the parcel is approved or that the home meets installation conditions. Foundation work, utilities and setup remain separately arranged, and the placement permit does not authorize oversize travel by itself.
