If loading work for a Danville mobile home move needs a full or partial street closure, ask Public Works Engineering to classify the operation. The city's closure application calls for approved traffic-control and detour plans and notifications to property owners. Build those tasks into the loading plan before fixing the date.
Identify who prepares the plan and notifications
The Danville temporary right-of-way closure application asks for a responsible person on site, the affected block range and the requested dates and times. It distinguishes full street, partial street, sidewalk and parking-space occupation. Ask staff which category fits the hauling operation and which supporting documents are needed.

For street closures, name the person who will prepare the traffic and detour arrangements and the person who will notify the affected owners. Confirm the current submission and notification timetable with the city rather than treating the mover's availability as the approved work window.
Discuss the street-space requirement with the transporter
Provide the pickup and delivery locations and describe any anticipated street obstruction. Ask who will handle the closure plan and the required notifications.
Keep access alterations separate from temporary occupation
The Danville engineering permit guidance separately addresses curb cuts, drainage and excavation in the right-of-way. If the receiving approach needs alteration, have the responsible site contractor resolve that work before the hauler relies on the new access.
A through-haul and a stationary loading closure raise different questions. Give the transporter the approved working-space details alongside its route instructions, and specify how a change to the closure window will affect the booking. Site construction and installation are separate from the transport handoff.
